Major Equipment
Sr. No. | Name of the Equipment | Year of Purchase | Amount (Rs.) | Name of Lab, where installed |
Fig. No. |
1 | Tyrone Workstations | 2023 | 4,56,884/- | EE-116 (New Block EIE) | 1 |
2 | Multi-physiological signal system with complete sensors | 2021 | 20,39,715/- | Biomedical Lab (E-102) |
2 & 3 |
3 | Portable X-Ray Machine | 2021 | 1,50,000/- | Biomedical Lab (E-102) |
4 |
4 | Scientech 2700 high voltage power electrical lab workbench | 2021 | 6,89,120/- | Power Electronics Lab (E-324) |
5 |
5 | Viscometer | 2021 | 1,48,000/- | Analytical Lab (E-102) |
6 |
6 | MP160 System with Acq Knowledge Window or Mac and accessories | 2020 | 9,62,000/- | Biomedical Lab (E-102) |
7 |
7 | Basic + Advanced Pneumatic + Electro Pneumatic training Kit (1each with 1 Rolling Table, 2 Drawer Units, 2 Power Supply) | 2019 | 88,000,00/- |
Centre for Training and Research in Automation (Automation Laboratory) (New Block EIE) |
8 & 9 |
8 | Training Kit-PLC Module | ||||
9 | Pick And Place Demo Kit | ||||
10 | Sorting Demo Kit | ||||
11 | Stamping Demo Kit | ||||
12 | Vacuum Technology | ||||
13 | Transparent Hydraulic Kit (Level 1, 2 & Electro-hydraulics) | ||||
14 | Sensor Training Kit with Table | ||||
15 | Pneumatic Magnetic Board Symbols for Training Purpose | ||||
16 | Electrical Power Transmission Line Simulator | 2018 | 3,95,000/- | Power System Lab (E-101) |
10 |
17 | Power Factor Control Kit | 2018 | 1,25,000/- | Power System Lab (E-101) |
11 |
18 | Sequence Impedance of Alternator by Fault Analysis Panel | 2018 | 1,75,000/- | Power System Lab (E-101) |
12 |
19 | Feeder Protection Simulation Panel | 2018 | 3,50,000/- | Power System Lab (E-101) |
13 |
20 | Generator Protection Simulation Panel | 2018 | 3,60,000/- | Power System Lab (E-101) |
14 |
21 | Transformer Protection Simulation Panel | 2018 | 2,60,000/- | Power System Lab (E-101) |
15 |
22 | Radial and Ring Main Distribution System Training Panel | 2018 | 2,50,000/- | Power System Lab (E-101) |
16 |
23 | Air Circuit Breaker Panel | 2018 | 2,00,000/- | Power System Lab (E-101) |
17 |
24 | Vaccum Circuit Breaker Panel | 2018 | 4,50,000/- | Power System Lab (E-101) |
18 |
25 | Static Var Controller | 2018 | 1,25,000/- | Power System Lab (E-101) |
– |
26 | A,B,C,D parameters of transmission line model | 2018 | 1,12,100/- | Power systems Lab (E-101) |
19 |
(Figure No.-1 #### Tyrone Workstations)
(Figure No.-2 #### Multi-physiological signal system)
(Figure No.-3 #### Multi-physiological signal system)
(Figure No.-4 #### Portable X-Ray Machine)
(Figure No.-5 #### Scientech 2700 high voltage power electrical lab workbench)
(Figure No.-6 #### Viscometer)
(Figure No.-7 #### MP160 Data Acquisition System)
(Figure No.-8 #### PLC Based Modules (Stamping, Sorting, Pick and Place)
(Figure No.-9 #### Hydraulic and Pneumatic Workbenches)
(Figure No.-10 #### Electrical Power Transmission Line Simulator)
(Figure No.-11 #### Power Factor Control Kit)
(Figure No.-12 #### Fault Analysis of 3-phase Alternator)
(Figure No.-13 #### Feeder Protection Simulation Panel)
(Figure No.-14 #### Generator Protection Simulation Panel)
(Figure No.-15 #### Transformer Protection Simulation Panel)
(Figure No.-16 #### DC Distribution System Training Panel)
(Figure No.-17 #### Air Circuit Breaker Panel)
(Figure No.-18 #### Vacuum Circuit Breaker Panel)
(Figure No.-19 #### A,B,C,D parameters of transmission line model)